Overview

Completed in 2013 and developed as a Permittee Responsible Mitigation (PRM) Site, the project was designed to meet the specific needs of a confidential client. The primary stream onsite was deeply incised and had been relocated to the toe of the valley slope to maximize the land available for grazing and hay production.


Project Highlights

  • 1,700 linear feet of stream restoration and 2,200+ linear feet of total channel conservation
  • Re-established the stream to the center of the valley and restored floodplain connectivity
  • Permanently conserved the stream and riparian corridor including re established wetlands