Overview

As a Design-Build Institute of America (DBIA) Industry Partner, Timmons Group has extensive experience leveraging the design-build process for a wide variety of water and wastewater projects. Utilizing our innovative approaches throughout the process allows our clients to minimize project risks with an all-inclusive teaming arrangement in order to complete the project’s utility design and construction.

Unlike the traditional design-bid-build process, this approach allows our clients have access to a quality partnership that provides first-rate services from engineering design through construction completion. Not only will our services be provided efficiently and comprehensively, assuring exceptional long-term quality, value and efficiency but potential conflicts between the civil engineer and builder are eliminated.

By integrating the design and construction phases from project launch, our clients are offered a substantial savings of both time and budget parameters from concept plans to final punch list.

Projects

Prince George Pump Station
Zion Crossroads Wastewater Plant Effluent Relocation
James River Water Project
Fredericksburg Infrastructure Upgrades
Meherrin River Regional Jail Utilities
Riverside Elevated Water Tank